Name of Work: INTERCEPTION & DIVERSION (I&D) WORKS ALONG WITH SEWAGE TREATMENT PLANT OF CAPACITY 12.5 MLD FOR ATTUR AND NARASINGAPURAM MUNICIPALITY
Location: SALEM DISTRICT
Year: 2023 -2024
Estimate:
The objective of the consultancy is to prepare a Detailed Project Report (DPR) for Sewage Treatment Plant (STP) Of Capacity 12.5 MLD (for Interception & Diversion (I&D) works )Attur and Narasingapuram Municipality. As per the assessment carried out for understanding used water management and implementation options in the town, it was identified that the used water generated in the Attur and Narasingapuram Municipality is conveyed via storm water drains and disposed to Vashista River.
• To prepare the DPR for Sewage Treatment Plant (STP) Of Capacity 12.5 MLD (Interception & Diversion (I&D) works) in Attur and Narasingapuram Municipality, preparation of detailed design, drawings, cost estimates in Attur and Narasingapuram Municipality with suitable cost effective options. The existing available records if any shall be studied and levels taken/confirmed for its correctness and correct wherever necessary correspondingly in all documents.
• Site survey along and collection of primary & secondary data from Municipalities, Public Works Department (PWD), Water Supply and Sewerage Board and other line departments.
• Conducting walkthrough survey in the Attur and Narasingapuram Municipality along the drain route and its spatial mapping on Google Earth (Satellite Image) using Latitude/Longitude.
• Collection of used wastewater samples in existing storm water drain in the municipalities and analyzing it in NABL Accredited Laboratory agency & Government agency.
• Detailed analysis of data collected during field studies.
• Measurement of quantum of wastewater mixing in the lake.
Name of Work: INTERCEPTION & DIVERSION (I&D) WORKS ALONG WITH SEWAGE TREATMENT PLANT OF CAPACITY 7 MLD FOR TIRUMANGALAM MUNICIPALITY
Location: MADURAI DISTRICT
Year: 2023 -2024
Estimate:
The objective of the consultancy is to prepare a Detailed Project Report (DPR) for Interception & Diversion (I&D) works along With Sewage Treatment Plant (STP) Of Capacity 7 MLD For Tirumangalam Municipality. As per the assessment carried out for understanding used water management and implementation options in the town, it was identified that the used water generated in the Tirumangalam Municipality is conveyed via storm water drains and disposed to Vashista River.
• To prepare the DPR for Interception & Diversion (I&D) works along With Sewage Treatment Plant (STP) Of Capacity 7 MLD in Tirumangalam Municipality, preparation of detailed design, drawings, cost estimates in Tirumangalam Municipality with suitable cost effective options. The existing available records if any shall be studied and levels taken/confirmed for its correctness and correct wherever necessary correspondingly in all documents.
• Site survey along and collection of primary & secondary data from Municipalities, Public Works Department (PWD), Water Supply and Sewerage Board and other line departments.
• Conducting walkthrough survey in the Tirumangalam municipality along the drain route and its spatial mapping on Google Earth (Satellite Image) using Latitude/Longitude.
• Collection of used wastewater samples in existing storm water drain in the municipalities and analyzing it in NABL Accredited Laboratory agency & Government agency.
• Detailed analysis of data collected during field studies.
• Measurement of quantum of wastewater mixing in the lake.
Name of Work: INTERCEPTION & DIVERSION (I&D) WORKS ALONG WITH SEWAGE TREATMENT PLANT OF CAPACITY 12.5 MLD FOR PARAMAKUDI MUNICIPALITY
Location: RAMANATHAPURAM DISTRICT
Year: 2023 -2024
Estimate:
The objective of the consultancy is to prepare a Detailed Project Report (DPR) for Interception & Diversion (I&D) works along With Sewage Treatment Plant (STP) Of Capacity 12.5 MLD For Paramakudi Municipality. As per the assessment carried out for understanding used water management and implementation options in the town, it was identified that the used water generated in the Paramakudi Municipality is conveyed via storm water drains and disposed to Vashista River.
To prepare the DPR for Interception & Diversion (I&D) works along With Sewage Treatment Plant (STP) Of Capacity 12.5 MLD in Paramakudi Municipality, preparation of detailed design, drawings, cost estimates in Paramakudi Municipality with suitable cost effective options. The existing available records if any shall be studied and levels taken/confirmed for its correctness and correct wherever necessary correspondingly in all documents.
Site survey along and collection of primary & secondary data from Municipalities, Public Works Department (PWD), Water Supply and Sewerage Board and other line departments.
Conducting walkthrough survey in the Paramakudi municipality along the drain route and its spatial mapping on Google Earth (Satellite Image) using Latitude/Longitude.
Detailed analysis of data collected during field studies.
Measurement of quantum of wastewater mixing in the lake.
Name of Work: INTERCEPTION & DIVERSION (I&D) WORKS AT MELUR MUNICIPALITY
Location: MADURAI DISTRICT
Year: 2024 -2025
Estimate:
The objective of the consultancy is to prepare a Detailed Project Report (DPR) for Interception & Diversion (I&D) works for Melur Municipality. As per the assessment carried out for understanding used water management and implementation options in the town, it was identified that the used water generated in the Melur Municipality is conveyed via storm water drains and disposed to Pattalam Lake.
• To prepare the DPR for Interception & Diversion (I&D) works in Melur Municipality, preparation of detailed design, drawings, cost estimates in Melur Municipality with suitable cost effective options. The existing available records if any shall be studied and levels taken/confirmed for its correctness and correct wherever necessary correspondingly in all documents.
• Site survey along and collection of primary & secondary data from Municipalities.
• Conducting walkthrough survey in the Melur municipality along the drain route and its spatial mapping on Google Earth (Satellite Image) using Latitude/Longitude.
• Collection of used wastewater samples in existing storm water drain in the municipalities and analyzing it in NABL Accredited Laboratory agency & Government agency.
• Detailed analysis of data collected during field studies.
• Measurement of quantum of wastewater mixing in the lake.
Name of Work: INTERCEPTION & DIVERSION (I&D) WORKS ALONG WITH SEWAGE TREATMENT PLANT (STP) OF CAPACITY 7 MLD FOR DEVAKOTTAI MUNICIPALITY
Location: SIVAGANGA DISTRICT
Year: 2023 -2024
Estimate:
Water is a prime source for all the living creatures and its existence in this world. It exists in the form of surface water as rivers, lakes, ponds etc., as well as ground water. Rivers have a special attention in the lives of the Indians. River water is used for irrigation, domestic purpose, industrial and commercial use, which in return gives food to the people, economic growth and basic needs for the people.
• To prepare the DPR for Interception & Diversion (I&D) works along With Sewage Treatment Plant (STP) Of Capacity 7.00 MLD in Devakottai Municipality, preparation of detailed design, drawings, cost estimates in Devakottai Municipality with suitable cost-effective options. The existing available records if any shall be studied and levels taken/confirmed for its correctness and correct wherever necessary correspondingly in all documents.
• Site survey along and collection of primary & secondary data from Municipalities, Public Works Department (PWD), Water Supply and Sewerage Board and other line departments.
• Conducting walkthrough survey in the Devakottai municipality along the drain route and its spatial mapping on Google Earth (Satellite Image) using Latitude/Longitude.
• Collection of used wastewater samples in existing storm water drain in the municipalities and analyzing it in NABL Accredited Laboratory agency & Government agency.
• Detailed analysis of data collected during field studies.
• Measurement of quantum of wastewater mixing in the lake.