Name of Work: INTERCEPTION & DIVERSION (I&D) WORKS ALONG WITH SEWAGE TREATMENT PLANT OF CAPACITY 12.5 MLD FOR PARAMAKUDI MUNICIPALITY
Location: RAMANATHAPURAM DISTRICT
Year: 2023 -2024
Estimate:
The objective of the consultancy is to prepare a Detailed Project Report (DPR) for Interception & Diversion (I&D) works along With Sewage Treatment Plant (STP) Of Capacity 12.5 MLD For Paramakudi Municipality. As per the assessment carried out for understanding used water management and implementation options in the town, it was identified that the used water generated in the Paramakudi Municipality is conveyed via storm water drains and disposed to Vashista River.
To prepare the DPR for Interception & Diversion (I&D) works along With Sewage Treatment Plant (STP) Of Capacity 12.5 MLD in Paramakudi Municipality, preparation of detailed design, drawings, cost estimates in Paramakudi Municipality with suitable cost effective options. The existing available records if any shall be studied and levels taken/confirmed for its correctness and correct wherever necessary correspondingly in all documents.
Site survey along and collection of primary & secondary data from Municipalities, Public Works Department (PWD), Water Supply and Sewerage Board and other line departments.
Conducting walkthrough survey in the Paramakudi municipality along the drain route and its spatial mapping on Google Earth (Satellite Image) using Latitude/Longitude.
Detailed analysis of data collected during field studies.
Measurement of quantum of wastewater mixing in the lake.