MELUR STP

Name of Work: INTERCEPTION & DIVERSION (I&D) WORKS AT MELUR MUNICIPALITY

Location: MADURAI DISTRICT

Year: 2024 -2025

Estimate:

Objective

The objective of the consultancy is to prepare a Detailed Project Report (DPR) for Interception & Diversion (I&D) works for Melur Municipality. As per the assessment carried out for understanding used water management and implementation options in the town, it was identified that the used water generated in the Melur Municipality is conveyed via storm water drains and disposed to Pattalam Lake.

Scope of Work

• To prepare the DPR for Interception & Diversion (I&D) works in Melur Municipality, preparation of detailed design, drawings, cost estimates in Melur Municipality with suitable cost effective options. The existing available records if any shall be studied and levels taken/confirmed for its correctness and correct wherever necessary correspondingly in all documents.
• Site survey along and collection of primary & secondary data from Municipalities.
• Conducting walkthrough survey in the Melur municipality along the drain route and its spatial mapping on Google Earth (Satellite Image) using Latitude/Longitude.
• Collection of used wastewater samples in existing storm water drain in the municipalities and analyzing it in NABL Accredited Laboratory agency & Government agency.
• Detailed analysis of data collected during field studies.
• Measurement of quantum of wastewater mixing in the lake.

Project Info:

Category: stp project
Location: MADURAI DISTRICT
Year: 2024 -2025